Exterior

Architectural coordination

Align visible boxes, tracks, colors and installation positions.

Interior

Light and privacy planning

Respond to living, sleeping and circulation spaces.

Zones

Room-specific operation

Control one area independently or coordinate selected zones.

Project

One coordinated review

Bring drawings, openings and control requirements together.

一Whole-Home Conditions

A Villa Is More Than One Opening

Different facades, rooms and outdoor spaces face different conditions. A successful
project keeps the architecture consistent while giving each zone the performance it
needs.

01

Different Orientations

East, west, south and north-facing openings
experience sunlight differently.

02

Facade Consistency

Visible components should follow a coordinated
color, size and installation language.

03

Privacy by Room

Bedrooms, living rooms and boundary-facing areas require different privacy levels.

04

Indoor and Outdoor Use

Outdoor openings need stability while interior windows prioritize light and quiet operation.

05

Control Planning

Individual, grouped and scene-based control should match everyday routines.

06

Construction Coordination

Power, recesses, fixing surfaces and access should be reviewed before finishing work.

一Project Positioning

Coordinate the Villa
Before Selecting
Individual Systems

The Villa page is a project entry. It does not repeat the product lists
from Patio, Pergola, Office or Hotel. NewHoo first reviews the overall
building and then routes each zone to the correct solution.

One architectural direction
Coordinate appearance, installation lines and visible hardware across the property.

Different performance by zone
Set sunlight, privacy, exposure and operating priorities for each space.

One project contact
Submit the plan once and review the complete shading scope together.

一PLANNING FRAMEWORK

One Patio, Three Decisions

Product selection starts with the site conditions, not only the opening dimensions.

Architecture

Facade style, installation position, visible components, finish colors and structural interfaces.

Environment

Sun direction, wind exposure, privacy, room function and the required level of shading.

Operation

Manual, motorized, grouped or smart-home control based on each zone and daily routine.

一Project Zones

Configure the Villa Across Four
Main Zones

Patio, courtyard, indoor and special openings are reviewed as separate planning routes. Specific systems are recommended only after the drawings and site conditions are reviewed.

Zone 01

Patio

Attached outdoor spaces are reviewed for side sunlight, wind exposure, privacy, wall or ceiling fixing and everyday operation.

Zone 02

Courtyard

Garden and courtyard areas are planned around open boundaries, freestanding structures, multiple exposed sides and landscape integration.

Zone 03

Indoor

Living rooms, bedrooms and circulation areas are coordinated for daylight, glare, privacy, quiet operation and a consistent interior appearance.

Zone 04

Special Openings

Corner glazing, extra-wide or extra-high openings, sloped windows, roof glazing and irregular structures receive a separate engineering review.

一Why add side screens?

From Villa Drawings to a
Coordinated Shading Plan

Start with the building information. Detailed product selection follows the zone review.

01

Send the Project

Provide plans, elevations, opening schedules, photos and the project location.

02

Define the Zones

Separate patio, courtyard, indoor, canopy and special-opening requirements.

03

Review the Interfaces

Check fixing, recesses, power, control, finishes and installation access.

04

Confirm the Scope

Receive a coordinated direction before detailed quotation and production.

一Start Your Patio Project

Send Us the Opening
and Installation Photos

We will review the structure first, then recommend the system, guide type and control method.

●Opening width

●Installation photos

●Wall or ceiling mount

●Corner condition

●Opening height

●Quantity

●Control preference

●Project location

一Project Workflow

Patio ZIP Screen
Questions

Final system selection depends on the opening,
structure and exposure.

Why are there no product models on this page?
+

A villa contains multiple spaces with different conditions. Product models are selected only after each zone and opening has been reviewed.

Which villa zones can be included?
+

The coordinated review can cover patio, courtyard, indoor, canopy and special openings as one project scope.

When should shading be planned?
+

Planning before electrical, ceiling and facade finishes are completed gives the project more installation and control options.

Can different rooms be controlled separately?
+

Yes. Individual, grouped and scene-based control can be planned according to rooms, floors and everyday use.

What information should I send first?
+

Yes. Individual, grouped and scene-based control can be planned according to rooms, floors and everyday use.